Four load-bearing walls behind every batch.

Management, testing, analytics and traceability run as four independent systems. A failure in one is caught by the other three — that overlap is the point.

  • Quality system

    A GMP plant, organised to ISO 13485

    Facility, procedures and people sit under one GMP quality system aligned with ISO 13485 — the same framework our EU notified-body audit measures us against.

    ISO 13485Quality management
  • Product testing

    Endotoxin and residual DNA, held well below the limits

    Endotoxin stays under 0.05 EU/mg and residual DNA under 10 pg/µg — the two markers that decide whether a collagen material is safe to place in tissue.

    < 0.05 EU/mgEndotoxin · DNA < 10 pg/µg
  • Quality control

    Purity proven by orthogonal methods

    SEC-HPLC for molecular-weight distribution, SDS-PAGE for structural integrity, gas chromatography for residual solvents. Independent methods, so each result can be cross-checked against another.

    SEC-HPLC · SDS-PAGEPlus gas chromatography
  • Batch traceability

    One batch, one electronic record

    Every batch carries an electronic record label, so any unit shipped can be traced back through its raw-material lot, its fermentation run and its release tests.

    1 batch = 1 recordEnd-to-end trace
02

Document control

Four tiers of documentation, down to the last wipe.

A quality system is only as good as what it can prove. Ours runs in four tiers — from the manual that sets policy to the form that records a single cleaning step.

  1. 01

    Quality Manual

    Quality policy, objectives, organisational structure and responsibilities — the top-level document everything else derives from.

  2. 02

    Procedures

    How the system actually runs: deviation handling, change control, CAPA and risk management.

  3. 03

    Work Instructions

    The step-by-step layer — equipment operation, cleaning and maintenance, written for the person standing at the machine.

  4. 04

    Records & Forms

    Batch production, testing, cleaning and maintenance. Every action leaves a signed, retrievable trace.

Quality Manual and batch production records
Tier 1 Quality Manual and tier 4 batch production & inspection records, alongside instrument printouts from release testing.
03

Control points

The route a batch travels — and where we stop it.

Six control points from supplier to dispatch. Nothing advances to the next stage until the stage behind it has been signed off.

  1. 01

    Supplier qualification

    Incoming materials are only accepted from approved suppliers, and those suppliers are audited as part of our own certification scope.

  2. 02

    Raw material

    Identity, purity and bioburden are verified before anything is released to production.

  3. 03

    Fermentation & purification

    1,000 L fermentation with automated purification; in-process samples are taken at each step, not only at the end.

  4. 04

    Isolator filling

    Aseptic filling inside isolation technology, with environmental monitoring running for the whole fill.

  5. 05

    Batch testing & release

    Endotoxin, residual DNA, purity and sterility. A batch is released only against a complete, signed record.

  6. 06

    Warehouse & dispatch

    Released stock is held under controlled conditions and shipped with full documentation attached.

The whole system is built to GMP Annex 2 and ICH Q7 for pharmaceutical starting materials — the same reference framework our EU notified body audits against.

04

Certification

Audited in Europe. Certified in China.

In May 2025 our sterile disposable injection needle and sterile disposable blunt-tip injection needle passed an on-site system audit by the EU notified body UDEM — five days, three sites, four companies.

ISO 13485:2016 certificate
ISO 13485:2016 — Changzhou Timerein Biotechnology Co., Ltd.
NMPA export certificate
NMPA certificate for exportation of medical products.
5daysOn-site audit, start to finish
3sitesSupplier plants plus our own
4companiesThree suppliers and Timerein

The audit covered the same product family we ship — one of the reasons the certificate is worth reading rather than framing.

Audit opening meeting
Opening meeting — scope and schedule
Supplier warehouse walk-through
Supplier warehouse walk-through
Management review session
Management review session
Supplier quality system review
Supplier quality system review

Next step

Ask for the batch record.

Sample requests, OEM programmes and registration documentation — our team answers with the paperwork, not a brochure.